Maysville 25 kV

PJM queue ID C01-1063

Maysville 25 kV (C01-1063) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Mason County, KY. The filing names Maysville as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of August 31, 2027.

Queue IDC01-1063
Project nameMaysville 25 kV
Status (as published)Active
SubstationMaysville
Point of interconnectionMaysville 25 kV
CountyMason
StateKY
Voltage25 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-08-31
Source datasetcycle

Same substation and county

Maysville substation: 3 requests in the PJM queue, 2 active totaling 30 MW.

Queue IDProjectMWResourceStatus
AE2-285MC Solar30SolarUnder Construction
AI2-467Maysville 138 kV5.8SolarWithdrawn

Mason, KY: 8 requests in the PJM queue, 3 active totaling 908 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperEDPR NA Distributed Generation LLC
Transmission ownerEKPC
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy8.65
MW capacity0.0
MFO8.65
Submitted date4/17/2026
Last updated10/2/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.