North Clark-Spurlock substation interconnection queue
1 active project totaling 150 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name North Clark-Spurlock as the point of interconnection, all in KY.
Target commercial operation dates as filed run from Jul 2022 to Jun 2030 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: EKPC (2 filings).
1active projects
150active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-111 | Goldfinch Solar | 345 | 150 | Solar | EP | Jun 2030 |
| AF2-348 | North Clark-Spurlock 345 kV | 345 | 150 | Solar | Withdrawn | Jul 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.