Stuart substation interconnection queue

1 active project totalling 7 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
7active MW
2total filed
Queue IDProjectkVMWResourceStatus
AB1-169 Mason Energy Center 345 1,100 Gas Withdrawn
P51 Stuart Electric Generating Station 345 7 Coal In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.