MC Solar

PJM queue ID AE2-285

MC Solar (AE2-285) is listed in the PJM interconnection queue as a 30 MW solar project in Mercer County, PA. The filing names Maysville as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of January 29, 2027.

Queue IDAE2-285
Project nameMC Solar
Status (as published)Under Construction
SubstationMaysville
Point of interconnectionMaysville 69 kV
CountyMercer
StatePA
Voltage69 kV
Capacity30 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-01-29
Source datasetserial

Same substation and county

Maysville substation: 3 requests in the PJM queue, 2 active totaling 30 MW.

Queue IDProjectMWResourceStatus
C01-1063Maysville 25 kV0SolarActive
AI2-467Maysville 138 kV5.8SolarWithdrawn

Mercer, PA: 57 requests in the PJM queue, 5 active totaling 467.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy50
MW capacity30
MFO50

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.