MC Solar
PJM queue ID AE2-285
MC Solar (AE2-285) is listed in the PJM interconnection queue as a 30 MW solar project in Mercer County, PA. The filing names Maysville as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of January 29, 2027.
| Queue ID | AE2-285 |
|---|---|
| Project name | MC Solar |
| Status (as published) | Under Construction |
| Substation | Maysville |
| Point of interconnection | Maysville 69 kV |
| County | Mercer |
| State | PA |
| Voltage | 69 kV |
| Capacity | 30 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-01-29 |
| Source dataset | serial |
Same substation and county
Maysville substation: 3 requests in the PJM queue, 2 active totaling 30 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1063 | Maysville 25 kV | 0 | Solar | Active |
| AI2-467 | Maysville 138 kV | 5.8 | Solar | Withdrawn |
Mercer, PA: 57 requests in the PJM queue, 5 active totaling 467.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 50 |
| MW capacity | 30 |
| MFO | 50 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.