CL- Belsena Solar
PJM queue ID AF2-296
CL- Belsena Solar (AF2-296) is listed in the PJM interconnection queue as a 12 MW solar project in Clearfield County, PA. The filing names Madera as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of December 31, 2028.
| Queue ID | AF2-296 |
|---|---|
| Project name | CL- Belsena Solar |
| Status (as published) | EP |
| Substation | Madera |
| Point of interconnection | Madera 34.5 kV |
| County | Clearfield |
| State | PA |
| Voltage | 34.5 kV |
| Capacity | 12 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-12-31 |
| Source dataset | cycle |
Same substation and county
Madera substation: 2 requests in the PJM queue, 1 active totaling 12 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF1-135 | Madera 34.5 kV | 12 | Solar | Withdrawn |
Clearfield, PA: 53 requests in the PJM queue, 11 active totaling 840.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | CL-Belsena LLC |
|---|---|
| Transmission owner | PENELEC |
| Project type | Generation Interconnection |
| Cycle | TC1 |
| Stage | FINAL AGREEMENT |
| MW energy | 20.0 |
| MW capacity | 12.0 |
| MFO | 20.0 |
| Submitted date | 3/28/2020 |
| Withdrawn remarks | Customer Milestone Not Met |
| Last updated | 2/10/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.