Heritage Prairie Solar

PJM queue ID AE2-152

Heritage Prairie Solar (AE2-152) is listed in the PJM interconnection queue as a 90 MW solar project in Kankakee County, IL. The filing names Loretto-Wilton & Braidwood-Davis Creek as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of December 31, 2027.

Queue IDAE2-152
Project nameHeritage Prairie Solar
Status (as published)Engineering and Procurement
SubstationLoretto-Wilton & Braidwood-Davis Creek
Point of interconnectionLoretto-Wilton 345 kV & Braidwood-Davis Creek 345 kV
CountyKankakee
StateIL
Voltage345 kV
Capacity90 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-12-31
Source datasetserial

Same substation and county

Loretto-Wilton & Braidwood-Davis Creek substation: 3 requests in the PJM queue, 3 active totaling 318 MW.

Queue IDProjectMWResourceStatus
AD1-100Heritage Prairie Wind150WindUnder Construction
AE1-166Heritage Prairie Solar78SolarEngineering and Procurement

Kankakee, IL: 42 requests in the PJM queue, 15 active totaling 1,494.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy150
MW capacity90
MFO300

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.