Heritage Prairie Solar
PJM queue ID AE1-166
Heritage Prairie Solar (AE1-166) is listed in the PJM interconnection queue as a 78 MW solar project in Kankakee County, IL. The filing names Loretto-Wilton & Braidwood-Davis Creek as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of December 31, 2027.
| Queue ID | AE1-166 |
|---|---|
| Project name | Heritage Prairie Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Loretto-Wilton & Braidwood-Davis Creek |
| Point of interconnection | Loretto-Wilton 345 kV & Braidwood-Davis Creek 345 kV |
| County | Kankakee |
| State | IL |
| Voltage | 345 kV |
| Capacity | 78 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-12-31 |
| Source dataset | serial |
Same substation and county
Loretto-Wilton & Braidwood-Davis Creek substation: 3 requests in the PJM queue, 3 active totaling 318 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AD1-100 | Heritage Prairie Wind | 150 | Wind | Under Construction |
| AE2-152 | Heritage Prairie Solar | 90 | Solar | Engineering and Procurement |
Kankakee, IL: 42 requests in the PJM queue, 15 active totaling 1,494.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 150 |
| MW capacity | 78 |
| MFO | 150 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.