Poseidon Solar 2
PJM queue ID AH1-248
Poseidon Solar 2 (AH1-248) is listed in the PJM interconnection queue as a 15 MW solar project in Fayette County, PA. The filing names Lardin - Lake Lynn as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2028.
| Queue ID | AH1-248 |
|---|---|
| Project name | Poseidon Solar 2 |
| Status (as published) | Active |
| Substation | Lardin - Lake Lynn |
| Point of interconnection | Lardin - Lake Lynn 138kV |
| County | Fayette |
| State | PA |
| Voltage | 138 kV |
| Capacity | 15 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-12-31 |
| Source dataset | cycle |
Same substation and county
Lardin - Lake Lynn substation: 3 requests in the PJM queue, 3 active totaling 119 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH1-249 | Poseidon Storage | 80 | Battery | Active |
| AH1-247 | Poseidon Solar 1 | 24 | Solar | Active |
Fayette, PA: 56 requests in the PJM queue, 20 active totaling 6,162.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Poseidon Energy, LLC |
|---|---|
| Transmission owner | APS |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 25.0 |
| MW capacity | 15.0 |
| MFO | 65.0 |
| Submitted date | 9/9/2021 |
| Last updated | 11/17/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.