Substation Scout

Ladysmith CT 230 kV

PJM queue ID AH1-692

Ladysmith CT 230 kV (AH1-692) is listed in the PJM interconnection queue as a 26 MW gas project in Caroline County, VA. The filing names Ladysmith CT as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of November 30, 2028.

Queue IDAH1-692
Project nameLadysmith CT 230 kV
Status (as published)Active
SubstationLadysmith CT
Point of interconnectionLadysmith CT 230 kV
CountyCaroline
StateVA
Voltage230 kV
Capacity26 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2028-11-30
Source datasetcycle

Same substation and county

Ladysmith CT substation: 14 requests in the PJM queue, 5 active totaling 116 MW.

Queue IDProjectMWResourceStatus
AH1-691Ladysmith CT 230 kV26GasActive
AH1-683Ladysmith CT 230 kV25GasActive
AH1-682Ladysmith CT 230 kV21GasActive
AH1-694Ladysmith CT 230 kV18GasActive
W1-073Ladysmith CT 230kV498GasWithdrawn
AI1-010Ladysmith CT 230 kV200BatteryWithdrawn
AH1-222Ladysmith CT 230 kV30BatteryWithdrawn
AG1-154Ladysmith Battery Storage20BatteryWithdrawn
AI2-283Ladysmith CT 230 kV12.3GasWithdrawn
AI2-282Ladysmith CT 230 kV11.3GasWithdrawn
AI2-284Ladysmith CT 230 kV10.2GasWithdrawn
AI2-285Ladysmith CT 230 kV9.9GasWithdrawn

1 more on the substation page.

Caroline, VA: 62 requests in the PJM queue, 14 active totaling 964.7 MW.

A substation with the same name is named in PJM transmission planning materials: Ladysmith CT (DOM, 15 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)
Transmission ownerDominion
Project typeGeneration Interconnection
CycleTC2
StagePhase 3
MW energy0.0
MW capacity26.0
MFO209.0
Submitted date4/8/2025
Last updated6/25/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first