Ladysmith CT 230 kV
PJM queue ID AH1-692
Ladysmith CT 230 kV (AH1-692) is listed in the PJM interconnection queue as a 26 MW gas project in Caroline County, VA. The filing names Ladysmith CT as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of November 30, 2028.
| Queue ID | AH1-692 |
|---|---|
| Project name | Ladysmith CT 230 kV |
| Status (as published) | Active |
| Substation | Ladysmith CT |
| Point of interconnection | Ladysmith CT 230 kV |
| County | Caroline |
| State | VA |
| Voltage | 230 kV |
| Capacity | 26 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2028-11-30 |
| Source dataset | cycle |
Same substation and county
Ladysmith CT substation: 14 requests in the PJM queue, 5 active totaling 116 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH1-691 | Ladysmith CT 230 kV | 26 | Gas | Active |
| AH1-683 | Ladysmith CT 230 kV | 25 | Gas | Active |
| AH1-682 | Ladysmith CT 230 kV | 21 | Gas | Active |
| AH1-694 | Ladysmith CT 230 kV | 18 | Gas | Active |
| W1-073 | Ladysmith CT 230kV | 498 | Gas | Withdrawn |
| AI1-010 | Ladysmith CT 230 kV | 200 | Battery | Withdrawn |
| AH1-222 | Ladysmith CT 230 kV | 30 | Battery | Withdrawn |
| AG1-154 | Ladysmith Battery Storage | 20 | Battery | Withdrawn |
| AI2-283 | Ladysmith CT 230 kV | 12.3 | Gas | Withdrawn |
| AI2-282 | Ladysmith CT 230 kV | 11.3 | Gas | Withdrawn |
| AI2-284 | Ladysmith CT 230 kV | 10.2 | Gas | Withdrawn |
| AI2-285 | Ladysmith CT 230 kV | 9.9 | Gas | Withdrawn |
1 more on the substation page.
Caroline, VA: 62 requests in the PJM queue, 14 active totaling 964.7 MW.
A substation with the same name is named in PJM transmission planning materials: Ladysmith CT (DOM, 15 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 0.0 |
| MW capacity | 26.0 |
| MFO | 209.0 |
| Submitted date | 4/8/2025 |
| Last updated | 6/25/2026 |