Keystone-Desoto substation interconnection queue

5 active projects totaling 329.2 MW in the PJM queue, plus 2 with terminal status (shown grayed).

7 PJM queue filings name Keystone-Desoto as the point of interconnection, all in IN.

Target commercial operation dates as filed run from Dec 2025 to May 2029 (7 filings). 4 active filings target a date after November 27, 2026.

Transmission owner as filed: OVEC (1 filing).

5active projects
329.2active MW
7total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF1-119 Lake Trout Solar 345 140 Hybrid Engineering and Procurement Jan 2028
AI2-489 Keystone-Desoto 345 kV 345 97.2 Wind Withdrawn Dec 2025
AF1-223 Blackford Solar Energy Project 345 90 Solar Partially in Service - Under Construction Dec 2026
AI2-394 Keystone-Desoto 345 kV 345 66 Wind Withdrawn Dec 2025
AF2-388 Prairie Creek Wind 345 35.2 Wind EP May 2029
AF1-202 Blackford Wind Energy Project 345 34 Wind Partially in Service - Under Construction Sep 2026
AF2-162 Lake Trout Solar 345 30 Solar Engineering and Procurement Jan 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

2 changes to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-11-16AF1-202Status changen/a Under Construction → Partially in Service - Under Construction
2026-11-02AF1-223Status changen/a Under Construction → Partially in Service - Under Construction

Other PJM queue substations in Blackford County, IN

All 18 PJM queue filings in Blackford County, IN.

Other PJM queue substations in Jay County, IN

All 30 PJM queue filings in Jay County, IN.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first