Keystone-Desoto substation interconnection queue
5 active projects totalling 329.2 MW in the PJM queue, plus 2 with terminal status (shown greyed).
5active projects
329.2active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF1-119 | Lake Trout Solar | 345 | 140 | Hybrid | Engineering and Procurement |
| AI2-489 | Keystone-Desoto 345 kV | 345 | 97.2 | Wind | Withdrawn |
| AF1-223 | Blackford Solar Energy Project | 345 | 90 | Solar | Under Construction |
| AI2-394 | Keystone-Desoto 345 kV | 345 | 66 | Wind | Withdrawn |
| AF2-388 | Prairie Creek Wind | 345 | 35.2 | Wind | EP |
| AF1-202 | Blackford Wind Energy Project | 345 | 34 | Wind | Under Construction |
| AF2-162 | Lake Trout Solar | 345 | 30 | Solar | Engineering and Procurement |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.