Desoto - Keystone substation interconnection queue
2 active projects totalling 141.4 MW in the PJM queue, plus 1 with terminal status (shown greyed).
2active projects
141.4active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1710 | Desoto - Keystone 345 kV | 345 | 75 | Hybrid | Active |
| C01-1712 | Desoto - Keystone 345 kV | 345 | 66.4 | Wind | Active |
| AI2-064 | Desoto - Keystone 345 kV | 345 | 35.8 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.