Desoto - Keystone substation interconnection queue

2 active projects totalling 141.4 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
141.4active MW
3total filed
Queue IDProjectkVMWResourceStatus
C01-1710 Desoto - Keystone 345 kV 345 75 Hybrid Active
C01-1712 Desoto - Keystone 345 kV 345 66.4 Wind Active
AI2-064 Desoto - Keystone 345 kV 345 35.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.