Bluff Point substation interconnection queue
3 active projects totaling 147.2 MW in the PJM queue, plus 4 with terminal status (shown grayed).
Target commercial operation dates as filed run from Dec 2011 to Dec 2030 (7 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1755 | Bluff Point 138 kV | 138 | 120 | Battery | Active | Dec 2030 |
| AH2-227 | Bluff Point 138 kV | 138 | 75 | Battery | Withdrawn | Dec 2026 |
| AH2-223 | Bluff Point 138 kV | 138 | 30 | Solar | Withdrawn | Dec 2025 |
| S71 | Bluff Point | 138 | 24 | Wind | In Service | Dec 2017 |
| W2-068 | Bluff Point 138kV | 138 | 19.5 | Wind | Withdrawn | Dec 2011 |
| Y3-024 | Wabash Valley Power Association, Inc. | 12 | 3.2 | Gas | In Service | Jun 2015 |
| AA2-106 | Bluff Point 69kV | 69 | 0 | Battery | Withdrawn | Dec 2018 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Bluff Point (AEP, 1 mention).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Jay County, IN
- Keystone-Desoto: 5 active, 329.2 MW of 7 filed
- Jay: 5 active, 200 MW of 12 filed
- Pennville - Adams: 1 active, 37.2 MW of 3 filed
- Jay-Desoto: none active of 2 filed
- Pennville: none active of 2 filed
- Shelby: none active of 2 filed
Other PJM queue substations in Mercer County, OH
No other substation in Mercer County, OH is named as a point of interconnection in the PJM queue.