Bluff Point substation interconnection queue
3 active projects totalling 147.2 MW in the PJM queue, plus 4 with terminal status (shown greyed).
3active projects
147.2active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1755 | Bluff Point 138 kV | 138 | 120 | Battery | Active |
| AH2-227 | Bluff Point 138 kV | 138 | 75 | Battery | Withdrawn |
| AH2-223 | Bluff Point 138 kV | 138 | 30 | Solar | Withdrawn |
| S71 | Bluff Point | 138 | 24 | Wind | In Service |
| W2-068 | Bluff Point 138kV | 138 | 19.5 | Wind | Withdrawn |
| Y3-024 | Wabash Valley Power Association, Inc. | 12 | 3.2 | Gas | In Service |
| AA2-106 | Bluff Point 69kV | 69 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.