Bluff Point substation interconnection queue

3 active projects totalling 147.2 MW in the PJM queue, plus 4 with terminal status (shown greyed).

3active projects
147.2active MW
7total filed
Queue IDProjectkVMWResourceStatus
C01-1755 Bluff Point 138 kV 138 120 Battery Active
AH2-227 Bluff Point 138 kV 138 75 Battery Withdrawn
AH2-223 Bluff Point 138 kV 138 30 Solar Withdrawn
S71 Bluff Point 138 24 Wind In Service
W2-068 Bluff Point 138kV 138 19.5 Wind Withdrawn
Y3-024 Wabash Valley Power Association, Inc. 12 3.2 Gas In Service
AA2-106 Bluff Point 69kV 69 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.