Jay-Desoto substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-396 Jay-Desoto 138kV 138 36 Solar Withdrawn
AG1-324 New Jay PV & BESS 138 27.9 Hybrid Pending Termination

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.