Jay-Desoto substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Jay-Desoto as the point of interconnection, all in IN.
Target commercial operation dates as filed run from Dec 2026 to Sep 2028 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-396 | Jay-Desoto 138kV | 138 | 36 | Solar | Withdrawn | Dec 2026 |
| AG1-324 | New Jay PV & BESS | 138 | 27.9 | Hybrid | Withdrawn | Sep 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-12 | AG1-324 | Status change | n/a | Pending Termination → Withdrawn |
Other PJM queue substations in Blackford County, IN
- Keystone-Desoto: 5 active, 329.2 MW of 7 filed
- Jay: 5 active, 200 MW of 12 filed
- Desoto - Keystone: 2 active, 141.4 MW of 3 filed
- Sorenson-Desoto: none active of 3 filed
Other PJM queue substations in Jay County, IN
- Keystone-Desoto: 5 active, 329.2 MW of 7 filed
- Jay: 5 active, 200 MW of 12 filed
- Bluff Point: 3 active, 147.2 MW of 7 filed
- Pennville - Adams: 1 active, 37.2 MW of 3 filed
- Pennville: none active of 2 filed
- Shelby: none active of 2 filed