Pennville - Adams substation interconnection queue

1 active project totalling 37.2 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
37.2active MW
3total filed
Queue IDProjectkVMWResourceStatus
AH1-308 Pennville - Adams 138 kV 138 50 Battery Withdrawn
AI2-172 Pennville - Adams 138 kV 138 37.2 Solar Withdrawn
C01-1636 Pennville - Adams 138 kV 138 37.2 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.