Shelby substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

Target commercial operation dates as filed run from Jul 2022 to Dec 2023 (2 filings).

Transmission owner as filed: Dayton (1 filing).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF2-212 Shelby 138 kV 138 90 Solar Withdrawn Dec 2023
AF2-263 Shelby 138 kV 138 58.8 Solar Withdrawn Jul 2022

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Jay County, IN

All 30 PJM queue filings in Jay County, IN.

Other PJM queue substations in Shelby County, OH

No other substation in Shelby County, OH is named as a point of interconnection in the PJM queue.

All 1 PJM queue filings in Shelby County, OH.