Jay, IN interconnection queue
10 active projects totalling 477.4 MW in the PJM queue, plus 20 with terminal status (shown greyed).
10active projects
477.4active MW
30total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1755 | Bluff Point 138 kV | 138 | 120 | Battery | Active |
| AE1-189 | Penville-Adams 138 kV | 138 | 103 | Solar | Withdrawn |
| AI1-081 | Jay - DeSoto 138 kV | 138 | 100 | Hybrid | Withdrawn |
| AH2-114 | Not reported | n/r | 96.6 | Solar | Withdrawn |
| AE2-089 | Skycrest Solar Energy Center | 138 | 93 | Solar | Suspended |
| AF1-223 | Blackford Solar Energy Project | 345 | 90 | Solar | Under Construction |
| AF2-212 | Shelby 138 kV | 138 | 90 | Solar | Withdrawn |
| AH1-041 | Pennville 138 kV | 138 | 75 | Solar | Withdrawn |
| AH2-227 | Bluff Point 138 kV | 138 | 75 | Battery | Withdrawn |
| AG1-006 | Jay 138 kV | 138 | 60 | Solar | Withdrawn |
| AG1-047 | Sun Chief Solar Farm | 138 | 60 | Solar | Engineering and Procurement |
| AH1-308 | Pennville - Adams 138 kV | 138 | 50 | Battery | Withdrawn |
| AH1-431 | Pennville 138 kV | 138 | 50 | Battery | Withdrawn |
| AH2-371 | Jay 138 kV | 138 | 50 | Battery | Withdrawn |
| AI2-172 | Pennville - Adams 138 kV | 138 | 37.2 | Solar | Withdrawn |
| C01-1636 | Pennville - Adams 138 kV | 138 | 37.2 | Solar | Active |
| AI2-399 | Jay 138 kV | 138 | 36 | Solar | Withdrawn |
| C01-1593 | Jay 138 kV | 138 | 30.8 | Wind | Active |
| AG2-577 | Jay 138 kV | 138 | 30 | Solar | Withdrawn |
| AG2-578 | Jay 69 kV | 69 | 30 | Solar | Withdrawn |
| AH2-223 | Bluff Point 138 kV | 138 | 30 | Solar | Withdrawn |
| AG1-324 | New Jay PV & BESS | 138 | 27.9 | Hybrid | Pending Termination |
| S71 | Bluff Point | 138 | 24 | Wind | In Service |
| AC2-176 | Bitter Ridge Wind Farm | 138 | 16.9 | Wind | In Service |
| S26 | Bluff Point-Jay 138kV | 138 | 15 | Wind | Withdrawn |
| AI2-422 | Jay 138 kV | 138 | 12 | Solar | Withdrawn |
| AI2-423 | Jay 69 kV | 69 | 12 | Solar | Withdrawn |
| Y3-024 | Wabash Valley Power Association, Inc. | 12 | 3.2 | Gas | In Service |
| AG1-017 | Bitter Ridge Wind Farm | 138 | 2.3 | Wind | In Service |
| AA2-106 | Bluff Point 69kV | 69 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.