Substation Scout

Lake Trout Solar

PJM queue ID AF1-119

Lake Trout Solar (AF1-119) is listed in the PJM interconnection queue as a 140 MW hybrid project in Blackford County, IN. The filing names Keystone-Desoto as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of January 31, 2028.

Queue IDAF1-119
Project nameLake Trout Solar
Status (as published)Engineering and Procurement
SubstationKeystone-Desoto
Point of interconnectionKeystone-Desoto 345 kV
CountyBlackford
StateIN
Voltage345 kV
Capacity140 MW
Resource (as published)Solar; Storage
Resource categoryHybrid (normalized for filtering)
Target commercial operation2028-01-31
Source datasetserial

Same substation and county

Keystone-Desoto substation: 7 requests in the PJM queue, 5 active totaling 329.2 MW.

Queue IDProjectMWResourceStatus
AF1-223Blackford Solar Energy Project90SolarPartially in Service - Under Construction
AF2-388Prairie Creek Wind35.2WindEP
AF1-202Blackford Wind Energy Project34WindPartially in Service - Under Construction
AF2-162Lake Trout Solar30SolarEngineering and Procurement
AI2-489Keystone-Desoto 345 kV97.2WindWithdrawn
AI2-394Keystone-Desoto 345 kV66WindWithdrawn

Blackford, IN: 18 requests in the PJM queue, 10 active totaling 547.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy200
MW capacity140
MFO200

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first