Lake Trout Solar
PJM queue ID AF2-162
Lake Trout Solar (AF2-162) is listed in the PJM interconnection queue as a 30 MW solar project in Blackford County, IN. The filing names Keystone-Desoto as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of January 31, 2028.
| Queue ID | AF2-162 |
|---|---|
| Project name | Lake Trout Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Keystone-Desoto |
| Point of interconnection | Keystone-Desoto 345 kV |
| County | Blackford |
| State | IN |
| Voltage | 345 kV |
| Capacity | 30 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-01-31 |
| Source dataset | serial |
Same substation and county
Keystone-Desoto substation: 7 requests in the PJM queue, 5 active totaling 329.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF1-119 | Lake Trout Solar | 140 | Hybrid | Engineering and Procurement |
| AF1-223 | Blackford Solar Energy Project | 90 | Solar | Partially in Service - Under Construction |
| AF2-388 | Prairie Creek Wind | 35.2 | Wind | EP |
| AF1-202 | Blackford Wind Energy Project | 34 | Wind | Partially in Service - Under Construction |
| AI2-489 | Keystone-Desoto 345 kV | 97.2 | Wind | Withdrawn |
| AI2-394 | Keystone-Desoto 345 kV | 66 | Wind | Withdrawn |
Blackford, IN: 18 requests in the PJM queue, 10 active totaling 547.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 45 |
| MW capacity | 30 |
| MFO | 245 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.