1 active project totalling 250 MW in the PJM queue, plus 5 with terminal status (shown greyed).

1active projects
250active MW
6total filed
Queue IDProjectkVMWResourceStatus
AA2-108 Plano 765kV 765 2,060 Not reported Withdrawn
AF1-200 Plano 345 kV 345 2,035 Not reported Withdrawn
V1-022 Plano 345kV 345 380 Gas Withdrawn
C01-1778 Plano 345 kV 345 250 Battery Active
AH2-258 Plano 345 kV 345 172 Hybrid Withdrawn
AH2-259 Plano 345 kV 345 172 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.