Kendall, IL interconnection queue

4 active projects totalling 663.5 MW in the PJM queue, plus 13 with terminal status (shown greyed).

4active projects
663.5active MW
17total filed
Queue IDProjectkVMWResourceStatus
AA2-108 Plano 765kV 765 2,060 Not reported Withdrawn
AF1-200 Plano 345 kV 345 2,035 Not reported Withdrawn
V1-022 Plano 345kV 345 380 Gas Withdrawn
C01-1336 Plano - Lasco Station 345 kV 345 300 Battery Active
AE2-340 Sandwich-Plano n/r 208.8 Battery Withdrawn
AG2-453 Lasalle - Plano 345 kV 345 196 Solar Active
AH2-258 Plano 345 kV 345 172 Hybrid Withdrawn
AH2-259 Plano 345 kV 345 172 Battery Withdrawn
C01-1708 Plano - Lasco Station 345 kV 345 125 Battery Withdrawn
AE2-341 Plano Skies Energy Center 138 100.6 Solar EP
AF1-030 Plano Skies Energy Center 138 66.9 Solar EP
AB2-154 Kendall 345kV 345 65 Gas Withdrawn
AG2-316 Sandwich-Plano 138 KV 138 49.4 Battery Withdrawn
AF2-329 Sandwich-Plano 138 kV 138 42.2 Battery Withdrawn
AI1-119 Shorewood 138kV 138 18.7 Solar Withdrawn
AF2-034 Kendall 345kV 345 10.8 Hybrid Withdrawn
AA2-136 Kendall n/r 10 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.