Robinson substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG2-509 Robinson 69 kV 69 36.3 Hybrid Withdrawn
AG2-277 Robinson 69 kV 69 34 Hybrid Withdrawn
AG2-278 Robinson 69 kV 69 12 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.