Jeffersonville-South Charleston substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-263 | Jeffersonville-South Charleston 69 kV | 69 | 31.1 | Hybrid | Withdrawn |
| AG2-264 | Jeffersonville-South Charleston 69 kV | 69 | 14.7 | Hybrid | Withdrawn |
| AG2-265 | Jeffersonville-South Charleston 69 kV | 69 | 12 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.