Jeffersonville-South Charleston substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG2-263 Jeffersonville-South Charleston 69 kV 69 31.1 Hybrid Withdrawn
AG2-264 Jeffersonville-South Charleston 69 kV 69 14.7 Hybrid Withdrawn
AG2-265 Jeffersonville-South Charleston 69 kV 69 12 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.