Greene-Clark substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Greene-Clark as the point of interconnection, all in OH.
Target commercial operation dates as filed run from May 2019 to Sep 2026 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AD1-140 | Kingwood Solar | 138 | 95.8 | Solar | Withdrawn | Sep 2026 |
| AC2-192 | Greene-Clark 138kV | 138 | 21 | Solar | Withdrawn | May 2019 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Greene County, OH
- Cedarville: 1 active, 200 MW of 3 filed
- Glady Run–Xenia: none active of 2 filed
Other PJM queue substations in Fayette County, OH
- Greenfield: 1 active, 31.6 MW of 3 filed
- Jeffersonville-South Charleston: none active of 3 filed
- Robinson: none active of 3 filed