Earleys substation interconnection queue
3 active projects totalling 67 MW in the PJM queue, plus 7 with terminal status (shown greyed).
3active projects
67active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| U1-031 | Earleys 230kV | 230 | 80 | Other | Withdrawn |
| AA1-065 | Aulander Holloman Solar Park | 230 | 53.6 | Solar | In Service |
| AD2-013 | Earleys 115 kV | 115 | 52.4 | Solar | Withdrawn |
| AE1-035 | Aulander Holloman Solar Park | 230 | 13.4 | Solar | In Service |
| W1-057 | Earleys 34.5kV | 34.5 | 7.6 | Solar | Withdrawn |
| AE2-151 | Kruger Energy Hertford | 34.5 | 6.5 | Solar | Withdrawn |
| AB2-087 | Earleys 34.5kV | 34.5 | 3.4 | Solar | Withdrawn |
| AB2-073 | Earleys 230kV | 230 | 0 | Solar | Withdrawn |
| AC2-063 | Earleys 230kV | 230 | 0 | Solar | Withdrawn |
| AG2-238 | Earleys 230 kV | 230 | 0 | Battery | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.