Kelford substation interconnection queue
2 active projects totalling 16.1 MW in the PJM queue, plus 2 with terminal status (shown greyed).
2active projects
16.1active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Z2-043 | Kelford Solar Park | 34.5 | 14 | Solar | In Service |
| R93 | Kelford 115kV | 115 | 12 | Gas | Withdrawn |
| W3-050 | Kelford 34.5kV | 34.5 | 7.6 | Solar | Withdrawn |
| AA1-072 | Kelford Solar Park | 34.5 | 2.1 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.