Kelford substation interconnection queue
2 active projects totaling 16.1 MW in the PJM queue, plus 2 with terminal status (shown grayed).
4 PJM queue filings name Kelford as the point of interconnection, all in Bertie County, NC.
Target commercial operation dates as filed run from Mar 2008 to Dec 2015 (4 filings).
2active projects
16.1active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| Z2-043 | Kelford Solar Park | 34.5 | 14 | Solar | In Service | Dec 2015 |
| R93 | Kelford 115kV | 115 | 12 | Gas | Withdrawn | Mar 2008 |
| W3-050 | Kelford 34.5kV | 34.5 | 7.6 | Solar | Withdrawn | Dec 2012 |
| AA1-072 | Kelford Solar Park | 34.5 | 2.1 | Solar | In Service | Dec 2015 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Bertie County, NC
- Earleys: 2 active, 67 MW of 10 filed
- Cashie: 2 active, 66 MW of 9 filed
- Cashie-Trowbridge: 1 active, 51.8 MW of 3 filed
- Cashie-Earleys: none active of 5 filed