Substation Scout

Kelford substation interconnection queue

2 active projects totalling 16.1 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
16.1active MW
4total filed
Queue IDProjectkVMWResourceStatus
Z2-043 Kelford Solar Park 34.5 14 Solar In Service
R93 Kelford 115kV 115 12 Gas Withdrawn
W3-050 Kelford 34.5kV 34.5 7.6 Solar Withdrawn
AA1-072 Kelford Solar Park 34.5 2.1 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.