Aulander Holloman Solar Park

PJM queue ID AA1-065

Aulander Holloman Solar Park (AA1-065) is listed in the PJM interconnection queue as a 53.6 MW solar project in Hertford County, NC. The filing names Earleys as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2018.

Queue IDAA1-065
Project nameAulander Holloman Solar Park
Status (as published)In Service
SubstationEarleys
Point of interconnectionEarleys 230kV
CountyHertford
StateNC
Voltage230 kV
Capacity53.6 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2018-12-31
Source datasetserial

Same substation and county

Earleys substation: 10 requests in the PJM queue, 2 active totaling 67 MW.

Queue IDProjectMWResourceStatus
AE1-035Aulander Holloman Solar Park13.4SolarIn Service
U1-031Earleys 230kV80OtherWithdrawn
AD2-013Earleys 115 kV52.4SolarWithdrawn
W1-057Earleys 34.5kV7.6SolarWithdrawn
AE2-151Kruger Energy Hertford6.5SolarWithdrawn
AB2-087Earleys 34.5kV3.4SolarWithdrawn
AB2-073Earleys 230kV0SolarWithdrawn
AC2-063Earleys 230kV0SolarWithdrawn
AG2-238Earleys 230 kV0BatteryWithdrawn

Hertford, NC: 30 requests in the PJM queue, 5 active totaling 82.1 MW.

A substation with the same name is named in PJM transmission planning materials: Earleys (DOM, 7 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy80
MW capacity53.6
MFO80

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first