Ahoskie substation interconnection queue

3 active projects totalling 11.9 MW in the PJM queue, plus 5 with terminal status (shown greyed).

3active projects
11.9active MW
8total filed
Queue IDProjectkVMWResourceStatus
AG1-082 NC1 Ahoskie Central Solar Project 34.5 12 Hybrid Withdrawn
AG1-083 Ahoskie 34.5 kV 34.5 12 Hybrid Withdrawn
AC1-163 Ahoskie 34.5KV 34.5 11.5 Solar Withdrawn
AE2-346 Colice Hall Solar 34.5 8.4 Solar In Service
AG1-035 Ahoskie 34.5 kV 34.5 6 Solar Withdrawn
AB2-099 Colice Hall Solar 34.5 3.5 Solar In Service
AG1-037 NC3 Ahoskie South Solar Project 34.5 3 Hybrid Withdrawn
AH1-091 Ahoskie 34.5kV 34.5 0 Battery Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.