9 active projects totalling 591.9 MW in the PJM queue, plus 21 with terminal status (shown greyed).

9active projects
591.9active MW
30total filed
Queue IDProjectkVMWResourceStatus
C01-2143 Hogard Mill - Earleys 230 kV 230 200 Hybrid Active
AG1-312 Earleys-Cashie 230 kV 230 112 Solar Withdrawn
C01-1301 Cashie - Earleys 230 kV 230 90 Solar Active
C01-1727 Earleys - Cashie 230 kV 230 90 Solar Active
C01-1320 Kelford - Earleys 115 kV 115 78 Solar Active
AE1-024 Cashie 230 kV 230 63.8 Hybrid Withdrawn
AE1-025 Cashie 230 kV 230 63.8 Hybrid Withdrawn
AE1-026 Cashie 230 kV 230 63.8 Hybrid Withdrawn
AG1-437 Cashie-Earleys 230 kV 230 60 Solar Withdrawn
AG1-438 Cashie-Earleys 230 kV 230 60 Solar Withdrawn
AD1-132 Cashie 230 kV 230 57 Solar Withdrawn
AA1-135 Aulander Earleys Solar 230 56 Solar Withdrawn
AA1-136 Cashie-E. Trowbridge 230kV 230 56 Solar Withdrawn
AD1-022 Sumac Solar 230 51.8 Solar Engineering and Procurement
AE2-037 Earleys-Everetts 230 kV 230 48.2 Solar Withdrawn
AG2-382 Cashie 230 kV 230 42 Solar Active
AG1-442 Cashie-Earleys 230 kV 230 35 Battery Withdrawn
AG1-443 Cashie-Earleys 230 kV 230 35 Battery Withdrawn
AC2-158 Cashie-Earleys 230kV 230 32.5 Solar Withdrawn
AD2-183 Cashie 230 kV 230 31.2 Hybrid Withdrawn
AD2-184 Cashie 230 kV 230 31.2 Hybrid Withdrawn
AD2-185 Cashie 230 kV 230 31.2 Hybrid Withdrawn
AD1-023 Cashie-Trowbridge 230 kV 230 25.9 Solar Withdrawn
AH1-271 Cashie 230 kV 230 24 Solar Active
Z2-043 Kelford Solar Park 34.5 14 Solar In Service
R93 Kelford 115kV 115 12 Gas Withdrawn
AG1-036 Tunis 34.5 kV 34.5 8.1 Solar Withdrawn
W3-050 Kelford 34.5kV 34.5 7.6 Solar Withdrawn
AA1-072 Kelford Solar Park 34.5 2.1 Solar In Service
AC2-063 Earleys 230kV 230 0 Solar Withdrawn