Cashie substation interconnection queue

2 active projects totalling 66 MW in the PJM queue, plus 7 with terminal status (shown greyed).

2active projects
66active MW
9total filed
Queue IDProjectkVMWResourceStatus
AE1-024 Cashie 230 kV 230 63.8 Hybrid Withdrawn
AE1-025 Cashie 230 kV 230 63.8 Hybrid Withdrawn
AE1-026 Cashie 230 kV 230 63.8 Hybrid Withdrawn
AD1-132 Cashie 230 kV 230 57 Solar Withdrawn
AG2-382 Cashie 230 kV 230 42 Solar Active
AD2-183 Cashie 230 kV 230 31.2 Hybrid Withdrawn
AD2-184 Cashie 230 kV 230 31.2 Hybrid Withdrawn
AD2-185 Cashie 230 kV 230 31.2 Hybrid Withdrawn
AH1-271 Cashie 230 kV 230 24 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.