Cashie substation interconnection queue
2 active projects totalling 66 MW in the PJM queue, plus 7 with terminal status (shown greyed).
2active projects
66active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-024 | Cashie 230 kV | 230 | 63.8 | Hybrid | Withdrawn |
| AE1-025 | Cashie 230 kV | 230 | 63.8 | Hybrid | Withdrawn |
| AE1-026 | Cashie 230 kV | 230 | 63.8 | Hybrid | Withdrawn |
| AD1-132 | Cashie 230 kV | 230 | 57 | Solar | Withdrawn |
| AG2-382 | Cashie 230 kV | 230 | 42 | Solar | Active |
| AD2-183 | Cashie 230 kV | 230 | 31.2 | Hybrid | Withdrawn |
| AD2-184 | Cashie 230 kV | 230 | 31.2 | Hybrid | Withdrawn |
| AD2-185 | Cashie 230 kV | 230 | 31.2 | Hybrid | Withdrawn |
| AH1-271 | Cashie 230 kV | 230 | 24 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.