Cashie-Earleys substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
AG1-437 Cashie-Earleys 230 kV 230 60 Solar Withdrawn
AG1-438 Cashie-Earleys 230 kV 230 60 Solar Withdrawn
AG1-442 Cashie-Earleys 230 kV 230 35 Battery Withdrawn
AG1-443 Cashie-Earleys 230 kV 230 35 Battery Withdrawn
AC2-158 Cashie-Earleys 230kV 230 32.5 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.