Mapleton-Murphy substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AB2-148 Mapleton-Murphy 115kV 115 0 Solar Withdrawn
AB2-151 Mapleton-Murphy 115kV 115 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.