Cashie-Trowbridge substation interconnection queue

1 active project totaling 51.8 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Cashie-Trowbridge as the point of interconnection, all in NC.

Target commercial operation dates as filed run from Jun 2016 to Jul 2028 (3 filings). 1 active filing targets a date after November 27, 2026.

1active projects
51.8active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AA2-157 Cashie-Trowbridge 230kV 230 56 Solar Withdrawn Jun 2016
AD1-022 Sumac Solar 230 51.8 Solar Engineering and Procurement Jul 2028
AD1-023 Cashie-Trowbridge 230 kV 230 25.9 Solar Withdrawn Jun 2019

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Martin County, NC

All 9 PJM queue filings in Martin County, NC.

Other PJM queue substations in Bertie County, NC

All 30 PJM queue filings in Bertie County, NC.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first