Dresden Nuclear Generating Station U2
PJM queue ID Q49
Dresden Nuclear Generating Station U2 (Q49) is listed in the PJM interconnection queue as a 70 MW nuclear project in Grundy County, IL. The filing names Dresden as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of January 31, 2012.
| Queue ID | Q49 |
|---|---|
| Project name | Dresden Nuclear Generating Station U2 |
| Status (as published) | In Service |
| Substation | Dresden |
| Point of interconnection | Dresden 345kV |
| County | Grundy |
| State | IL |
| Voltage | 345 kV |
| Capacity | 70 MW |
| Resource (as published) | Nuclear |
| Resource category | Nuclear (normalized for filtering) |
| Target commercial operation | 2012-01-31 |
| Source dataset | serial |
Same substation and county
Dresden substation: 6 requests in the PJM queue, 4 active totaling 175 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| Q50 | Dresden Nuclear Station Unit 3 | 70 | Nuclear | In Service |
| C01-1053 | Dresden 345 kV | 32 | Nuclear | Active |
| X1-045 | Dresden Nuclear Generation Station, Units 2 & 3 | 3 | Nuclear | In Service |
| AH2-421 | Dresden 138kV | 230 | Battery | Withdrawn |
| X3-045 | Dresden | 32 | Nuclear | Withdrawn |
Grundy, IL: 44 requests in the PJM queue, 18 active totaling 3,015.2 MW.
A substation with the same name is named in PJM transmission planning materials: Dresden (COMED, 6 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 70 |
| MW capacity | 70 |
| MFO | 957 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.