Kent
PJM queue ID A28
Kent (A28) is listed in the PJM interconnection queue as a 98 MW gas project in Kent County, DE. The filing names Dover as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 14, 2001.
| Queue ID | A28 |
|---|---|
| Project name | Kent |
| Status (as published) | In Service |
| Substation | Dover |
| Point of interconnection | Dover |
| County | Kent |
| State | DE |
| Voltage | Not reported |
| Capacity | 98 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2001-06-14 |
| Source dataset | serial |
Same substation and county
Dover substation: 3 requests in the PJM queue, 1 active totaling 98 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| N44 | Dover | 1 | Other | Withdrawn |
| AA1-091 | Dover 12kV | 0 | Battery | Withdrawn |
Kent, DE: 34 requests in the PJM queue, 13 active totaling 320.2 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 100 |
| MW capacity | 98 |
| MFO | 100 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.