Delaware-Van Buren substation interconnection queue
3 active projects totaling 97.8 MW in the PJM queue, plus 1 with terminal status (shown grayed).
4 PJM queue filings name Delaware-Van Buren as the point of interconnection, all in Delaware County, IN.
Target commercial operation dates as filed run from Dec 2025 to Dec 2030 (4 filings). 3 active filings target a date after November 27, 2026.
Transmission owner as filed: AEP (2 filings).
3active projects
97.8active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE1-208 | Meadow Forge Solar Energy Center | 138 | 55 | Solar | Suspended | Nov 2026 |
| AH1-307 | Delaware-Van Buren 138 kV | 138 | 50 | Battery | Withdrawn | Dec 2025 |
| AE2-169 | Meadow Forge Solar Energy Center | 138 | 33 | Solar | Suspended | Nov 2026 |
| AH1-304 | Delaware-Van Buren 138 kV | 138 | 9.8 | Solar | Active | Dec 2030 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Delaware County, IN
- Desoto: 2 active, 26 MW of 6 filed
- Delaware-Royerton: none active of 4 filed