Delaware-Royerton substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).
4 PJM queue filings name Delaware-Royerton as the point of interconnection, all in Delaware County, IN.
Target commercial operation dates as filed run from Dec 2023 to Oct 2029 (4 filings).
Transmission owner as filed: AEP (4 filings).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-335 | Royerton Solar and Storage | 138 | 60 | Solar | Withdrawn | Dec 2023 |
| AG2-085 | Delaware-Royerton 138 kV | 138 | 24 | Solar | Withdrawn | Dec 2027 |
| AF2-370 | Royerton Solar and Storage | 138 | 20 | Battery | Withdrawn | Dec 2023 |
| AH1-742 | Delaware-Royerton 138 kV | 138 | 20 | Battery | Withdrawn | Oct 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Delaware County, IN
- Delaware-Van Buren: 3 active, 97.8 MW of 4 filed
- Desoto: 2 active, 26 MW of 6 filed