Delaware, IN interconnection queue
6 active projects totalling 321.4 MW in the PJM queue, plus 16 with terminal status (shown greyed).
6active projects
321.4active MW
22total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1774 | Desoto - 05LOSANTVILL 345 kV | 345 | 304 | Solar | Withdrawn |
| C01-1369 | ROYERTON - DESOTO 138 kV | 138 | 100 | Battery | Active |
| AE1-217 | Gaston 138kV | 138 | 84 | Solar | Withdrawn |
| AF1-298 | Desoto 345 kV | 345 | 84 | Solar | Withdrawn |
| AF2-173 | Esker Solar Park | 345 | 84 | Solar | Withdrawn |
| AI2-115 | Desoto 345 kV | 345 | 84 | Solar | Withdrawn |
| AH1-607 | Not reported | n/r | 71.4 | Solar | Withdrawn |
| AG2-519 | Royerton - Desoto 138 kV | 138 | 66.5 | Hybrid | Active |
| AF2-335 | Royerton Solar and Storage | 138 | 60 | Solar | Withdrawn |
| AG1-367 | Esker Solar Park II | 345 | 60 | Solar | Withdrawn |
| AF1-268 | Hawthorn Solar | 138 | 57.1 | Solar | Engineering and Procurement |
| AE1-208 | Meadow Forge Solar Energy Center | 138 | 55 | Solar | Suspended |
| AE2-170 | Gaston-Desoto 138 kV | 138 | 50 | Battery | Withdrawn |
| AH1-307 | Delaware-Van Buren 138 kV | 138 | 50 | Battery | Withdrawn |
| AI2-170 | Delaware - Van Buren 138 kV | 138 | 39.1 | Solar | Withdrawn |
| AE2-169 | Meadow Forge Solar Energy Center | 138 | 33 | Solar | Suspended |
| AF1-313 | Wes Del-Royerton 138 kV | 138 | 24 | Solar | Withdrawn |
| AG2-085 | Delaware-Royerton 138 kV | 138 | 24 | Solar | Withdrawn |
| AF2-370 | Royerton Solar and Storage | 138 | 20 | Battery | Withdrawn |
| AH1-742 | Delaware-Royerton 138 kV | 138 | 20 | Battery | Withdrawn |
| V3-053 | Desoto 138kV | 138 | 19.5 | Wind | Withdrawn |
| AH1-304 | Delaware-Van Buren 138 kV | 138 | 9.8 | Solar | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.