Delaware, IN interconnection queue

6 active projects totalling 321.4 MW in the PJM queue, plus 16 with terminal status (shown greyed).

6active projects
321.4active MW
22total filed
Queue IDProjectkVMWResourceStatus
C01-1774 Desoto - 05LOSANTVILL 345 kV 345 304 Solar Withdrawn
C01-1369 ROYERTON - DESOTO 138 kV 138 100 Battery Active
AE1-217 Gaston 138kV 138 84 Solar Withdrawn
AF1-298 Desoto 345 kV 345 84 Solar Withdrawn
AF2-173 Esker Solar Park 345 84 Solar Withdrawn
AI2-115 Desoto 345 kV 345 84 Solar Withdrawn
AH1-607 Not reported n/r 71.4 Solar Withdrawn
AG2-519 Royerton - Desoto 138 kV 138 66.5 Hybrid Active
AF2-335 Royerton Solar and Storage 138 60 Solar Withdrawn
AG1-367 Esker Solar Park II 345 60 Solar Withdrawn
AF1-268 Hawthorn Solar 138 57.1 Solar Engineering and Procurement
AE1-208 Meadow Forge Solar Energy Center 138 55 Solar Suspended
AE2-170 Gaston-Desoto 138 kV 138 50 Battery Withdrawn
AH1-307 Delaware-Van Buren 138 kV 138 50 Battery Withdrawn
AI2-170 Delaware - Van Buren 138 kV 138 39.1 Solar Withdrawn
AE2-169 Meadow Forge Solar Energy Center 138 33 Solar Suspended
AF1-313 Wes Del-Royerton 138 kV 138 24 Solar Withdrawn
AG2-085 Delaware-Royerton 138 kV 138 24 Solar Withdrawn
AF2-370 Royerton Solar and Storage 138 20 Battery Withdrawn
AH1-742 Delaware-Royerton 138 kV 138 20 Battery Withdrawn
V3-053 Desoto 138kV 138 19.5 Wind Withdrawn
AH1-304 Delaware-Van Buren 138 kV 138 9.8 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.