Seaman substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Seaman as the point of interconnection, all in OH.
Target commercial operation dates as filed run from Oct 2016 to Oct 2017 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AB2-103 | Seaman 138kV | 138 | 27.2 | Solar | Withdrawn | Oct 2017 |
| AA1-125 | Seaman 138kV | 138 | 7.6 | Solar | Withdrawn | Oct 2016 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Adams County, OH
- Kyger Creek - Pierce: 1 active, 150 MW of 2 filed
- Gavin #2: 2 active, 31 MW of 2 filed
- Stuart: 1 active, 7 MW of 2 filed
- Adams: none active of 5 filed
- Killen: none active of 3 filed
- South Canton-Harmon: none active of 2 filed