Killen substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Killen as the point of interconnection, all in Adams County, OH.
Target commercial operation dates as filed run from May 2008 to Dec 2018 (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| S12 | Killen 345kV | 345 | 1,300 | Coal | Withdrawn | Jan 2014 |
| AC2-056 | Killen 345kV | 345 | 13.4 | Solar | Withdrawn | Dec 2018 |
| U1-090 | Killen Electric Generating Station | 345 | 12 | Coal | Deactivated | May 2008 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Adams County, OH
- Kyger Creek - Pierce: 1 active, 150 MW of 2 filed
- Gavin #2: 2 active, 31 MW of 2 filed
- Stuart: 1 active, 7 MW of 2 filed
- Adams: none active of 5 filed
- Seaman: none active of 2 filed
- South Canton-Harmon: none active of 2 filed