Magley substation interconnection queue
1 active project totaling 81 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Magley as the point of interconnection, all in Adams County, IN.
Target commercial operation dates as filed run from Dec 2024 to Mar 2030 (2 filings). 1 active filing targets a date after November 27, 2026.
1active projects
81active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-232 | Magley Solar Energy Center | 138 | 81 | Solar | Engineering and Procurement | Mar 2030 |
| AI2-168 | Magley 138 kV | 138 | 32.4 | Solar | Withdrawn | Dec 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Adams County, IN
- Olive-University Park: 3 active, 205 MW of 6 filed
- Adams: none active of 5 filed