Chesterfield 230 kV
PJM queue ID AG2-384
Chesterfield 230 kV (AG2-384) is listed in the PJM interconnection queue as a 24 MW battery project in Chesterfield County, VA. The filing names Chesterfield as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2031.
| Queue ID | AG2-384 |
|---|---|
| Project name | Chesterfield 230 kV |
| Status (as published) | Active |
| Substation | Chesterfield |
| Point of interconnection | Chesterfield 230 kV |
| County | Chesterfield |
| State | VA |
| Voltage | 230 kV |
| Capacity | 24 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2031-12-31 |
| Source dataset | cycle |
Same substation and county
Chesterfield substation: 11 requests in the PJM queue, 8 active totaling 1,240 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF1-128 | Chesterfield CT Units 1 and 2 | 569 | Gas | UC |
| AF1-129 | Chesterfield CT Units 3&4 | 569 | Gas | Under Construction |
| S79 | Chesterfield Unit #6 | 27 | Coal | In Service |
| S80 | Chesterfield Unit #5 | 20 | Coal | In Service |
| R63 | Chesterfield Unit #5 | 19 | Coal | In Service |
| C01-1087 | Chesterfield 230 kV | 6 | Gas | Active |
| C01-1088 | Chesterfield 230 kV | 6 | Gas | Active |
| X2-082 | Chesterfield 230kV | 1,420 | Gas | Withdrawn |
| AG2-646 | Chesterfield 230 kV | 200 | Battery | Withdrawn |
| AG2-269 | Chesterfield 230 kV | 150 | Battery | Withdrawn |
Chesterfield, VA: 41 requests in the PJM queue, 21 active totaling 2,439.7 MW.
A substation with the same name is named in PJM transmission planning materials: Chesterfield (DOM, 8 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 60.0 |
| MW capacity | 24.0 |
| MFO | 60.0 |
| Submitted date | 3/29/2021 |
| Last updated | 8/25/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.