Chester Solar

PJM queue ID AE2-027

Chester Solar (AE2-027) is listed in the PJM interconnection queue as a 72 MW solar project in Chesterfield County, VA. The filing names Harrowgate-Locks as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of October 29, 2027.

Queue IDAE2-027
Project nameChester Solar
Status (as published)Suspended
SubstationHarrowgate-Locks
Point of interconnectionHarrowgate-Locks 115kV
CountyChesterfield
StateVA
Voltage115 kV
Capacity72 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-10-29
Source datasetserial

Same substation and county

Harrowgate-Locks substation: 2 requests in the PJM queue, 1 active totaling 72 MW.

Queue IDProjectMWResourceStatus
AE1-232Harrowgate-Locks 115 kV72SolarWithdrawn

Chesterfield, VA: 41 requests in the PJM queue, 21 active totaling 2,439.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy120
MW capacity72
MFO120

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.