Chesterfield Unit #6 (S79) is listed in the PJM interconnection queue as a 27 MW coal project in Chesterfield County, VA. The filing names Chesterfield as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 1, 2010.

Queue IDS79
Project nameChesterfield Unit #6
Status (as published)In Service
SubstationChesterfield
Point of interconnectionChesterfield 230kV
CountyChesterfield
StateVA
Voltage230 kV
Capacity27 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Target commercial operation2010-12-01
Source datasetserial

Same substation and county

Chesterfield substation: 11 requests in the PJM queue, 8 active totaling 1,240 MW.

Queue IDProjectMWResourceStatus
AF1-128Chesterfield CT Units 1 and 2569GasUC
AF1-129Chesterfield CT Units 3&4569GasUnder Construction
AG2-384Chesterfield 230 kV24BatteryActive
S80Chesterfield Unit #520CoalIn Service
R63Chesterfield Unit #519CoalIn Service
C01-1087Chesterfield 230 kV6GasActive
C01-1088Chesterfield 230 kV6GasActive
X2-082Chesterfield 230kV1,420GasWithdrawn
AG2-646Chesterfield 230 kV200BatteryWithdrawn
AG2-269Chesterfield 230 kV150BatteryWithdrawn

Chesterfield, VA: 41 requests in the PJM queue, 21 active totaling 2,439.7 MW.

A substation with the same name is named in PJM transmission planning materials: Chesterfield (DOM, 8 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy27
MW capacity27
MFO691

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first