Substation Scout

Bellwood - Brown Boveri Tap 115 kV

PJM queue ID C01-1682

Bellwood - Brown Boveri Tap 115 kV (C01-1682) is listed in the PJM interconnection queue as a 200 MW battery project in Chesterfield County, VA. The filing names Bellwood - Brown Boveri Tap as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of February 28, 2031.

Queue IDC01-1682
Project nameBellwood - Brown Boveri Tap 115 kV
Status (as published)Active
SubstationBellwood - Brown Boveri Tap
Point of interconnectionBellwood - Brown Boveri Tap 115 kV
CountyChesterfield
StateVA
Voltage115 kV
Capacity200 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2031-02-28
Source datasetcycle

Same substation and county

Chesterfield, VA: 41 requests in the PJM queue, 21 active totaling 2,439.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperRiver Walk Energy Center, LLC
Transmission ownerDominion
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy200.0
MW capacity200.0
MFO200.0
Submitted date4/27/2026
Last updated6/16/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.