Bellwood - Brown Boveri Tap 115 kV
PJM queue ID C01-1682
Bellwood - Brown Boveri Tap 115 kV (C01-1682) is listed in the PJM interconnection queue as a 200 MW battery project in Chesterfield County, VA. The filing names Bellwood - Brown Boveri Tap as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of February 28, 2031.
| Queue ID | C01-1682 |
|---|---|
| Project name | Bellwood - Brown Boveri Tap 115 kV |
| Status (as published) | Active |
| Substation | Bellwood - Brown Boveri Tap |
| Point of interconnection | Bellwood - Brown Boveri Tap 115 kV |
| County | Chesterfield |
| State | VA |
| Voltage | 115 kV |
| Capacity | 200 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2031-02-28 |
| Source dataset | cycle |
Same substation and county
Chesterfield, VA: 41 requests in the PJM queue, 21 active totaling 2,439.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | River Walk Energy Center, LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 200.0 |
| MW capacity | 200.0 |
| MFO | 200.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/16/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.