Basin - Chesterfield 230 kV
PJM queue ID C01-2171
Basin - Chesterfield 230 kV (C01-2171) is listed in the PJM interconnection queue as a 425 MW nuclear project in Chesterfield County, VA. The filing names Basin - Chesterfield as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of January 1, 2032.
| Queue ID | C01-2171 |
|---|---|
| Project name | Basin - Chesterfield 230 kV |
| Status (as published) | Active |
| Substation | Basin - Chesterfield |
| Point of interconnection | Basin - Chesterfield 230 kV |
| County | Chesterfield |
| State | VA |
| Voltage | 230 kV |
| Capacity | 425 MW |
| Resource (as published) | Nuclear Fusion |
| Resource category | Nuclear (normalized for filtering) |
| Target commercial operation | 2032-01-01 |
| Source dataset | cycle |
Same substation and county
Basin - Chesterfield substation: 2 requests in the PJM queue, 2 active totaling 545 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1543 | Basin - Chesterfield 230 kV | 120 | Battery | Active |
Chesterfield, VA: 41 requests in the PJM queue, 21 active totaling 2,439.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | 4th Power LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 425.0 |
| MW capacity | 425.0 |
| MFO | 425.0 |
| Submitted date | 4/24/2026 |
| Last updated | 6/11/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.