Harrowgate 1
PJM queue ID AE2-212
Harrowgate 1 (AE2-212) is listed in the PJM interconnection queue as a 12 MW solar project in Chesterfield County, VA. The filing names Harrowgate as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of June 30, 2027.
| Queue ID | AE2-212 |
|---|---|
| Project name | Harrowgate 1 |
| Status (as published) | Engineering and Procurement |
| Substation | Harrowgate |
| Point of interconnection | Harrowgate 34 kV |
| County | Chesterfield |
| State | VA |
| Voltage | 34 kV |
| Capacity | 12 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-06-30 |
| Source dataset | serial |
Same substation and county
Harrowgate substation: 2 requests in the PJM queue, 1 active totaling 12 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF2-258 | Harrowgate 34.5 kV | 3 | Solar | Withdrawn |
Chesterfield, VA: 41 requests in the PJM queue, 21 active totaling 2,439.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 12 |
| MFO | 20 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.