Tap Venus - Navarro substation interconnection queue

2 active projects totalling 663.6 MW in the ERCOT queue.

2active projects
663.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
29INR0196 Two Step Solar 345 401.6 Solar SS Completed, FIS Started, No IA
25INR0018 Yellow Cat Wind 345 262 Wind SS Completed, FIS Completed, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.