Tap Kopprl Capacitor Yard - Navarro substation interconnection queue

2 active projects totaling 126.8 MW in the ERCOT queue.

2 ERCOT queue filings name Tap Kopprl Capacitor Yard - Navarro as the point of interconnection, all in Navarro County, TX.

Target commercial operation date as filed: Dec 2028 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Kennedy Bypass Solar LLC (2 filings).

2active projects
126.8active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
24INR0256 Kennedy Solar 345 101.5 Solar SS Completed, FIS Started, No IA Dec 2028
24INR0391 Kennedy Storage 345 25.3 Battery SS Completed, FIS Started, No IA Dec 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Navarro County, TX

All 29 ERCOT queue filings in Navarro County, TX.