Haney (213) - Hubbard_8 () Line substation interconnection queue

2 active projects totalling 124.3 MW in the ERCOT queue.

2active projects
124.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
25INR0220 Hector Solar 138 81.6 Solar SS Completed, FIS Started, No IA
25INR0221 Hector Storage 138 42.7 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.