Tap BRIAR_CRK_8 – POWELL1_8 substation interconnection queue

2 active projects totaling 125.8 MW in the ERCOT queue.

2 ERCOT queue filings name Tap BRIAR_CRK_8 – POWELL1_8 as the point of interconnection, all in Navarro County, TX.

Target commercial operation date as filed: Nov 2027 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Orca Falls Solar, LLC (2 filings).

2active projects
125.8active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
26INR0130 Elm Flats Solar SLF 138 125.8 Solar SS Completed, FIS Started, IA Nov 2027
26INR0131 Elm Flats Storage SLF 138 0 Battery SS Completed, FIS Started, IA Nov 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Navarro County, TX

All 29 ERCOT queue filings in Navarro County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first