Tap BRIAR_CRK_8 – POWELL1_8 substation interconnection queue
2 active projects totalling 125.8 MW in the ERCOT queue.
2active projects
125.8active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 26INR0130 | Elm Flats Solar SLF | 138 | 125.8 | Solar | SS Completed, FIS Started, IA |
| 26INR0131 | Elm Flats Storage SLF | 138 | 0 | Battery | SS Completed, FIS Started, IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.