Substation Scout

Tap BRIAR_CRK_8 – POWELL1_8 substation interconnection queue

2 active projects totalling 125.8 MW in the ERCOT queue.

2active projects
125.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
26INR0130 Elm Flats Solar SLF 138 125.8 Solar SS Completed, FIS Started, IA
26INR0131 Elm Flats Storage SLF 138 0 Battery SS Completed, FIS Started, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.